| 1 | Course Introduction and Overview - Airline Schedule Planning, Links to Operations
 
  |  | 
| 2-6 | Optimizing Flows on Networks - Time-space Networks
 - Constrained Shortest Path Problems on Acyclic Shortest Paths
 - Multicommodity Flow Models (Node-arc, Path, Tree, Keypath-continuous and Integer)
 - Column and Row Generation Techniques
 - Branch-and-Bound
 - Branch-and-Price-and-Cut
 - Computational Experiences
 - OPL Studio
 
  | Assignment 1 Handed Out
  Begin to Form Project Teams | 
| 7 | The Passenger Mix Model - Model Description and Solution Algorithms
 - Review of Results by Kniker, et al. and Sensitivity Analysis of Lohatepanont
 
  |  | 
| 8-11 | The Fleet Assignment Problem - Basic Models and Solution Approaches, and their Shortcomings
 - Itinerary-based Fleet Assignment- Model and Branch-and-Price-and-Cut Solution Techniques
 - Subnetwork-based Fleet Assignment- Model and Solution Approach
 - Fleet Assignment Model Extensions to Include Time Windows
 - Review of Results
 
  | Assignment 1 Due | 
| 12-13 | Review and Quiz | Assignment 2 Handed Out | 
| 14-17 | Crew Scheduling, the Aircraft Routing Problem, and the Integrated Crew Pairing-Aircraft Routing Problem - Crew Pairing Problem, Bidline Generation/Rostering
 - Crew Pairing Problem Models and Solution Approaches
 - Branch on Follow-ons
 - Review of Results of Barnhart, et al.
 - Aircraft Routing Problem Models and Solution Approach-constrained Shortest Paths, Branch-and-Price
 - Integrated Crew Pairing and Aircraft Routing
 
  | Assignment 2 Due
  Assignment 3 Handed Out | 
| 18 | Integrated Fleeting Models - Integrated Crew Pairing and Fleet Assignment
 - Integrated Aircraft Routing and Fleet Assignment
 
  |  | 
| 19 | The Schedule Design Problem - Demand and Supply Interactions
 - Network Wide, Schedule Improver Model and Solution Approach
 - Review of Results
 
  | Assignment 3 Due
  Finalized Project Proposals Due | 
| 20-22 | Operations Recovery - Overview of Operations Control Center
 - Aircraft and Passenger Delays
 - Flight Postponement and Cancellation Model
 - The Role of Simulation
 
  |  | 
| 23-24 | Robust Scheduling - Robust Crew Scheduling
 - Robust Aircraft Routing
 - Degradable Schedule Design
 
  |  | 
| 25-26 | Project Presentations and Reports | Project Reports and Presentations Due |